Various resources are made available here to inform about the Northpark Drive Overpass Project. Included are downloadable files as well as videos, all of which are publicly available via participating entities.
Video Resources
Northpark Drive Traffic Simulation
YouTube video, will play in place. To enlarge choose the full screen icon in the lower right of the video
Northpark Drive Design Simulation
YouTube video, will play in place. To enlarge choose the full screen icon in the lower right of the video
Northpark Drive Overpass Project
YouTube video, will play in place. To enlarge choose the full screen icon in the lower right of the video
Project Documents
Additional Resources
KINGWOOD AREA MOBILITY STUDY
Commissioned by the Lake Houston Redevelopment Authority, May 2015, the Kingwood Area Mobility Study is a sub-regional traffic study for the greater Kingwood Area.
Appendix A
Appendix B
- Intersection Improvements
- Kingwood Drive from US59 to Woodland Hills (Six Lanes)
- Northpark Road from US59 to Woodland Hills Drive (Six Lanes)
- Woodland Hills Extension to Hamblen and Widening
- Kingwood Grade Separation Estimate
- Northpark Drive Grade Separation Estimate
Appendix C
- Full Traffic Analysis Report
- Traffic Data
- Existing Traffic Analysis Worksheets
- Future (No Build) Traffic Analysis Worksheets
- Alernative Analysis Worksheets
- AM Priority 1
- PM Priority 1
- AM Priority 2
- PM Priority 2
- AM Priority 3
- PM Priority 3
- AM Priority 4
- PM Priority 4
- AM Priority 5
- PM Priority 5
- AM Priority 6
- PM Priority 6
- AM Alt B
- PM Alt B
- AM Alt E
- PM Alt E
- AM Alt F
- PM Alt F
- AM Alt G
- PM Alt G
- AM Alt H
- PM Alt H
- AM Alt I
- PM Alt I
- AM Alt K
- PM Alt K
- AM Alt N
- PM Alt N
- AM Alt O
- PM Alt O
- Alternatives Exhibits
- Appendix D (Public Involvement)
PUBLIC MEETING DOCUMENTS
- Project Email List
- Meeting Handouts
- Public Meeting Photos
- Public Comment Forms